A tender for the engineering, procurement, and construction (EPC) of 4 MW rooftop solar projects with integrated battery systems has been released by the Odisha Renewable Energy Development Agency (OREDA). On a rate contract basis, these projects would be carried out at various Odisha locales. The proposal submission date is January 27, 2025.

The bidders must pay a bid security of Rs 300,000, a bid cost of Rs 10,500, and a processing charge of Rs 1,000, as stated in the tender guidelines.The chosen contractors will be in charge of the rooftop solar systems’ engineering, design, supply, installation, testing, commissioning, and upkeep. Complete lifetime management and battery system integration are also included in the scope. After the project is commissioned, a five-year comprehensive maintenance agreement is mandetory.

The bidders must have prior experience working on rooftop or ground-mounted solar installations with a minimum capacity of 500 kW, per the eligibility requirements. A 200 kW capacity is the bare minimum of experience needed for bidders registered in Odisha. Bidders must also demonstrate a positive turnover for the 2024 fiscal year. For the fiscal years 2022, 2023, and 2024, Category B bidders must have an average yearly turnover of at least Rs 20 million. The Ministry of New and Renewable Energy’s Approved List of Models and Manufacturers must contain the modules utilized in the projects. In accordance with the general terms of the contract, delays in project execution will result in penalties, including liquidated damages.

Follow us  for more detailed about the solar news.

Leave a Comment

Your email address will not be published. Required fields are marked *

Shopping Cart